IsoTool™ Fixes Both Ends
By Jordan Dyck, Integral Pipeline Technologies
Client request |
In a single pig run the 12” IsoTool isolated both the launch and receive traps to allow for 19 new valves to be installed. |
The best solution |
The client wanted to replace all the valves at the launch and receive |
Plan and deliver |
The IsoTool was launched out 60’ and set in under 40 minutes. After a successful Isolation Assurance Test, the launcher was drained down and 10 valves were replaced. The IsoTool was unset, pumped 17 miles and parked 180’ upstream of the receive trap valve. After the IsoTool was set, and the Isolation Assurance Test passed, the |
Service completion |
The IsoTool was unset and pumped into the trap, where it was pulled and found to have significant paraffin buildup on the front two modules of the tool. This buildup did not affect the holding capabilities of the IsoTool. |