Inaugural 18” IsoTool Isolation
Jordan Dyck, Integral Pipeline Technologies
Client request |
Integrals 18” IsoTool provides isolation for a leaking trap valve in its inaugural run. The client wanted to replace a leaking launch valve and trap bypass valve on a gasoline pipeline. This valve was presenting a potential safety concern every time a pig needed to be loaded. |
The best solution |
To avoid leaving fittings on the pipeline, or purging several miles, the client contacted Integral to quickly, safely and economically provide a seal so the two valves could be changed out. |
Plan and deliver |
The 18” IsoTool was pumped 75 feet to its target parking zone and was sent in 51 minutes. The valve change outs were performed efficiently, and the IsoTool was |
Service completion |
Integral technicians tracked the pig to trap where it was pulled without event. |