Easy In / Easy Out -- 3 New Valves
By Jordan Dyck, Integral Pipeline Technologies
Client request |
Configured to be bi-directional, the Integral IsoTool was used to isolate a 10” pipeline launcher in North Dakota. |
The best solution |
A leaking launch valve was an integrity concern and constantly required packing grease anytime a pig was needed to be launched. To remediate the problem, the client needed to change the |
Plan and deliver |
Using the IsoTool allowed production and flow to remain on-line downstream of the repair site. |
Service completion |
A 12 hour window was granted for the work to be completed, and the upstream production was back on-line in 10 hours |