20” and 16” IsoTools Deployed to Same Facility
By Jordan Dyck, Integral Pipeline Technologies
Client requested |
One of our regular clients had a 20” receive valve and a 16” launch valve leaking in the same yard. |
Understanding the best solution |
Integral arrived with both diameter tools and completed both sets during the same mobilization, further saving the client money. |
Planning and delivery |
The 20” was launched 57 miles away and tracked until it was parked 400’ US of the trap. The IsoTool was set in under 45 minutes, and drain-up was less than 20 bbls. The valve was replaced and the tool was unset and pushed to trap. The 16” was launched out 80 |
Service completion report |
Both of these projects occurred within 3 days. This allowed for |